Menu
  • Home
  • ACEIT Suite
    • Product Info >
      • ACE
      • POST
      • CO$TAT
      • JACS
      • Librarian
      • ACE Plug-Ins
    • Video Overviews
    • Request Trial Version
    • Purchase
    • Testimonials
    • Welcome ACEIT 8.2
    • Product FAQ
  • Training
    • Training Options >
      • Open Training
      • Self-Paced Training
      • Tutoring & Customized Support
      • On-Site Training
      • Brown Bag Training
    • Training Videos
    • Schedule
    • Locations
    • Training FAQ
  • Public Resources
    • Resource Library
    • News Feed
    • ACEIT eNews
    • Compliance/Configuration
    • Support FAQ
  • User Resources
Log in
ACEIT Home
Home / ACEIT Suite - archive / Product Info > / POST
 

Program Office Support Tool (POST)

POST
 


A powerful tool that allows opening an ACE session from within Microsoft Excel

 Provides key functionality for reporting, what-if excursions, and presentation development  

Enables people unfamiliar with ACE to run ACE-hosted models from a familiar application

 

  • 8.2 POST Session Viewer

View ACE models, create new cases and even run simulations all within Excel

  • 8.2 POST Import Export Feature

Export charts to Word/PowerPoint; update entire presentations instantly



Quickly create a wide array of tabular reports and graphical charts within Excel

 

Different views of all your point estimates

POST Estimate Charts

  • 8.2 POST Sand Chart

Example Sand Chart: 
Stacked annual total costs displayed by fiscal year

  • 8.2 POST Pie Chart

Example Drill-Down Pie Chart: 
A total cost split into children costs at a chosen WBS level



A variety of methods to understand the uncertainty in your model


POST RI$K Charts

Example RI$K Chart:
S-Curve with markers at specified probability levels

Example Scatter Plot: 
Each iteration of two uncertain elements plotted against each other

Example Fan Chart:
Specifed ranges of uncertainty plotted by fiscal year

  • 8.2 POST S-Curve
  • 8.2 POST Scatter Plot
  • 8.2 POST Fan Chart


Compare results between rows, across cases and over years


POST Comparative Charts

Example Drill-Down Chart:
Compare results at a specified WBS level from different cases 

Example What-If Case Report:
Tabular report highlighting differences in the model across various cases

Example Phased Line Chart:
Plot a single row's annual results from different cases

  • 8.2 Post Drill-Down chart
  • 8.2 POST What-If Case
  • 8.2 POST Phased Line



Quickly determine what the model is most sensitive to and which elements have the greatest influence on the cost and uncertainty results

POST Analysis Charts


Example Tornado Chart:
Individually adjust variables to measure their effect on the total  

  • 8.2 POST Tornado

Example Variance Analysis Chart:
Find elements contributing most to the total variance (uncertainty)

  • 8.2 POST Variance Analysis


Popular Links

ACEIT Overview
Training Center
Purchase Options

Follow Us On LinkedIn

Subscriber Content

Inflation Indices
Patches
Instructional Videos

Help

Support Center
FAQs

Contact Us

ACEIT Sales
[email protected]

(805) 964-6963

ACEIT Training

[email protected]
(805) 964-6963

ACEIT Technical Support

[email protected]

Contact Details

Contact Us

Expand all

Collapse all

Tecolote Research, Inc. © 2004 - 2025| Privacy| Legal|  Do Not Sell My Personal Information| Cookies| About Us Tecolote logo transparent